HAV Design Projects Currently Under Construction
Allegan High School Performing Arts Center
Location: Allegan, Michigan
Project Details: Updating the Audio, Video, and Stage Lighting Design that was originally built in 2003
AV Budget: $925,000
Berkley High School Auditorium
Location: Berkley, Michigan
Project Details: Audio, Video, Lighting and Rigging Systems for the High School Auditorium and Black Box/Choir Room
AV Budget: $925,000
Comstock Park High School Auditorium
Location: Grand Rapids, Michigan
Project Details: The gymnasium is being updated with new audio, video and theatrical lighting systems. Stage track and drapery will also updated.
AV Budget: $155,000
Coit Elementary School
Location: Grand Rapids, Michigan
Project Details: The gymnasium is being updated with new audio, video and theatrical lighting systems. Stage track and drapery will also updated.
AV Budget: $155,000
Delta College K-Wing
Location: University Center, Michigan
Project Details: Audio and Video System upgrades for standard classrooms and an active learning classroom
AV Budget: $250,000
DeWitt High School Auditorium
Location: DeWitt, Michigan
Project Details: Auditorium Audio, Video and Lighting Upgrades
AV Budget: $400,000
Fairfield High School Auditorium
Location: Goshen, Indiana
Project Details: Auditorium Audio, Video and Lighting Renovation
AV Budget: $950,000
Hayes Intermediate School
Location: Grand Ledge, Michigan
Project Details: Audio and video systems for Band and Choir rooms, Gymnasion and Cafeteria
AV Budget: $175,000
Howell Highlander Way Middle School
Location: Howell, Michigan
Project Details: Audio, video and stage lighting for the Learning Commons and Cafeteria
AV Budget: $200,000
Howell Northwest and Southwest Elementary Schools
Location: Howell, Michigan
Project Details: Small auditorium stage lighting systems for two new elementary schools
AV Budget: $90,000
Innovation Central High School Auditorium
Location: Grand Rapids, Michigan
Project Details: Auditorium Audio, Video, Theatrical and Architectural Lighting, Rigging, Acoustic Orchestra Shell and Stage Track and Drapery
AV Budget: $1,492,199
Lyons Township High School South Campus
Location: Western Springs, Illinois
Project Details: New Music Rooms and Commons Audio and Video Systems
Project Budget: $290,000
Projected Project Completion: 2026
Meadowbrook Elementary
Location: Northbrook, Illinois
School District: Northbrook School District 28
Project Details: Audio and Video design services for the new gynmasium
The district is building a new building to replace the existing Meadowbrook Elementary, including the addition of a new gymnasium.
Project Budget: $45,000
Michigan State University - University Advancement
Location: East Lansing, Michigan
Project Details: Audio and Video Systems and Digital Signage Displays for conference rooms, colloboration space and Hub areas
Project Budget: $280,000
Mid Michigan College
Location: Mt. Pleaseant, Michigan
Project Details: Audio and Video Systems Design for new Event Center
Project Budget: $120,000
Minooka Community High School
Location: Minooka, Illinois
Project Details: Audio and Video Systems for Fieldhouse additiona and Central Campus Classrooms
Project Budget: $340,000
Northwestern Michigan College Hagerty Center
Location: Traverse City. Michigan
Project Details: Audio and Video Systems for renovated classroom and common spaces
Project Budget: $98,000
Oak Park & River Forest High School District 200
Location: Oak Park, Illinois
Project Details: Audio and videos system design for P.E. and Theater addition and renovation.
AV Budget: $255,000
Okemos Middle School Auditorium
Location: Okemos, Michigan
Project Details: Audio, Video, Theatrical Lighting and Rigging systems for the new auditorium
AV Budget: $685,000
People's Church
Location: East Lansing, Michigan
Project Details: Sanctuary and Social Hall Audio, Video and Lighting Systems
AV Budget: $92,000
Southern Illinois University Tedrick Welcome Center
Location: Carbondale, Illinois
Project Details: Audio and Video Systems for the new welcome center building
AV Budget: $320,000
Expected Completion Date: 2026
Wawasee High School Performing Arts Center
Location: Syracuse, Indiana
Project Details: New Performing Arts Center Audio, Video, Lighting and Rigging
AVTLR Budget: $2,164,000
2025 Select Completed Projects
Chippewa Valley Schools
Chippewa Valley High School Auditorium
Location: Clinton Township, Michigan
Project Details: Audio, Video and Lighting upgrades
- New sound system using Innovox speakers and subwoofers
- New Powersoft amplifiers
- Assisted listening package by Listen
- New LED lighting throughout using ETC products
- Stage drapery and tracks replaces
- Upgrades to the intercom system with wireless options
- Blue globe running lights backstage
- Dimming racks and controls, stage, house and control booth control stations and existing stage lighting fixtures were kept and worked into the new system
Project Budget: $100,000
Project Completed: 2025
Clare-Gladwin Regional Education Service District
John C. Magnus Career Education Center
Location: Clare, Michigan
Project Details: Audio, Video and Low Voltage Design –
- Safe and secure entrances using CCTV and card reader access controls
- Clocks and PA system throughout
- Classroom mobil carts with 86″ displays and soundbars
- Motorized screens with laser projectors and ceiling speakers in the Conference Center
- Classroom Voice Lift
- Wireless presentation receivers
- Touchpanels for room control and configureation in the Conference Center and Conference Room
Project Budget: $600,000
Project Completed: 2025
Dakota High School Auditorium
Chippewa Valley School District
Location: Clinton Township, Michigan
Project Details: Auditorium upgrades to the Audio, Video, and Wireless Intercom systems and Stage Drapery, Track and Theatrical Lighting
- Innovox speakers and subwoofers
- Powersoft amplifiers
- Assisted listening system by Listen
- Megalite LED Followspots
- ETC LED lighting
- Maxlite blue globe Jelly Jar LED lights
- New stage drapery and tracks
- Dimming racks and controls, stage, house and control booth control stations and existing stage lighting fixtures remain and are re-used.
AV Budget: $100,000
Grand Ledge High School
Location: Grand Ledge, Michigan
Project Details: Competition Gymnasium Scoreboard system as well as Audio and Video upgrades for multiple spaces: Competetive Gym, Old Gym, Media Center, Drama Room, and Cafeteria
- New wall-mounted 17’ x 10’ LED scoreboard display
- Fulcrum 15” 2-way loudspeakers and high-power amplifiers in the main Gym bleachers and courts
- QSC 15” 2-way loudspeakers and amplifiers in the Aux Gym
- QSC 2-way loudspeakers and amplifiers in other spaces
- Shure wireless microphones and receivers
- Epson 10,000 lumen laser projector and wide zoom lens
- 108” x 192” motorized projection screen in the Aux Gym
- Epson 6000 lumen projectors and 65” x 116” DaLite manual projection screen in Drama Room and Media Center
- New racks throughout to contain all AV inputs and Accessories
- Wall mounted Touchpanels for system control in all spaces
AV Budget: $297,000
Scoreboard Budget: $180,000
Pennoyer Elementary School
Location: Norridge, Illinois
Project Details: Audio and Video Systems for Learning Hubs, Multi Purpose Room, Music Room and Media Center
Phase 1:
Classroom Hubs and Multi Purpose Room
- Wall mounted displays and equipment racks
- Touchpanels for primary control
- Ceiling mounted speakers and wireless microphones
Music Room
- Wireless Apple TV connection to moveable TV on cart
- 2 wall mounted speakers at the front of the room
- Rack housed in cabinet that slides out/rotates
- Touchpanel for primary control
Phase 2:
Media Center
- Epson 6,200 Lumen laser projector suspended from the ceiling
- DaLite 58” x 104” screen
- 86” LG Series UHD Signage TV
- QSYS 4.5” two-way ceiling speakers and amplifier
- Shure wireless microphone system
- 7” Touchpanel for simple control of the system
Phase 1 Project Budget: $100,000 Completed in 2024
Phase 2 Project Budget: $45,000 Completed in 2025
Plainwell High School Athletics
Location: Plainwell, Michigan
Project Details: Audio and Video Systems for the new fieldhouse gymnasium and pool
- Flexible loudspeakers for the Gym bleachers and playing surface for multiple uses
- High Power Subwoofer over the Gym playing surface
- Loudspeakers to cover the pool deck and the bleachers
- Ceiling speakers in the hallway, hospitality room concessions and public restroom spaces
- Amplifiers and AV network switches
- Stationary and portable Equipment racks
- Multiple microphone/mixer input locations
- Bluetooth audio connections
- Touchpanels for user friendly control
- Wireless microphones
Project Budget: $170,000
Project Completed: 2025
Three Rivers High School Auditorium
Location: Three Rivers, Michigan
Project Details: Audio, Video and Acoustic Design for the Auditorium and Music Room
- Auditorium redesign and upgrade for all systems
- Auditorium Audio
- Auditorium Video
- Wireless Intercom System
- Auditorium House Lighting
- Theatrical Lighting
- Music room redesign and upgrade
- Ceiling mounted projector and screen
- Moveable equipment rack
- Audio re-enforcement
- Wireless and ceiling-hung microphones
AV Budget: $600,000
Project Completed: 2025
Toyota Indiana YMCA of Gibson County
Location: Princeton, Indiana
Project Details: Audio and Video System Design for the Renovation and Expansion of a School into a YMCA Facility
- RFC Loudspeakers and QSC Ceiling Speakers
- Powersoft Flexible Amplifiers with DSP
- Shure Wireless Microphones
- Wolfvision Cynap Pure Mini wireless presentation devices
- Extron Touchpanels
Marshall Overhead Video Camera
Project Budget: $110,000
Project Completed: 2025
University School of Milwaukee
Location: Milwaukee, Wisconsin
Project Details: Audio and video system design for two dining rooms, including independently operating spaces that have the ability to combine into one cohesive AV system.
Lower School/Middle School Dining Room Upgrades
- 3 independent AV systems able to operate jointly
- QSC 8” two-way low-profile speakers and 8-ch amplifier
Preschool Dining Room
- QSC 6.5” two-way low-profile speakers and 2-ch amplifier
All Spaces
- Shure Digital wireless receivers and transmitters
- Epson 7,500 Lumen laser projector in each space mounted on a Draper ceiling scissors lift
- DaLite 16:10 69” x 110” motorized screen
- Crestron 7” wall mount touchscreen with the ability to connect to the AV system via bluetooth
AVTLR Budget: $165,000
Project Completed: 2025
Waverly High School Auditorium
Location: Lansing, Michigan
Project Details: New Audio, Video, Control and Theatrical Lighting Systems
- Dalite motorized projection screen 146” x 260”
- Panasonic 12,000 lumen Laser Projector
- Fulcrum speakers and subwoofers
- Allen & Heath 36-fader digital mixing system
- 75 new LED color mixing fixtures
- Touchpanel controls at entrances and in the booth
- Wireless intercom system
- Panasonic displays in the lobby (65”) and backstage (43”)
Project Budget: $465,000
Project Completed: 2025
Worth School District 127
Location: Worth, Illinois
Buildings: Worthwoods Elementary School and Worth Junior High School
Project Details: Audio and Video for the additions to and the remodeling of tow media centers, a multimedia room and a music room
AV Budget: $140,000
Project Completed: 2025
2024 Select Completed Projects
Calumet Middle School
Location: Calumet Park, Illinois
Project Details: AV Systems for New Gym and Multi-Purpose Rooms
- Loudspeakers to cover bleacher and floor areas
- Amplifiers and DSP for all audio inside Arena
- 2-zone ceiling speakers in large MP room
- Bluetooth input and connection points
- Microphones (lapel, over-the-ear, wireless)
- Wall mounted and moveable displays
- Delegate style discussion system in large MP room
- Motorized 16:9 ratio projection screen in Small MP room
Project Budget: $225,000
Project Completed: 2024
Calvin University Athletics
Location: Grand Rapids, Michigan
Project Details: New Soccer Stadium and Athletics Audio, Video and Scoreboard
- 855 covered seating Soccer Stadium
- Sound System with 6 Large-Format Loudspeakers and 2 Subwoofers
- 65” Displays in the Team Rooms
- Audio with Bluetooth function in Team Rooms
- 8 65” Displays on motorized mounts in Football locker room
Project Budget: $500,000
Project Completed: 2024
Coopersville High School
Location: Coopersville, Michigan
Project Details: Football Stadium and Athletic Field Audio Systems and Scoreboard
- New Audio System for the Football Stadium
- Two large-format loudspeakers supported by several fill speakers
- New 32’ x 18’ 16mm pixel resolution Scoreboard
- New Audio System for the Multipurpose Field
- Two pairs of medium-format loudspeakers
- DSP, amplifiers and other audio equipment housed in an equipment rack at each field
- Ability to turn on/off system using a switch on the rack
Project Budget: $140,000
Project Completed: 2024
DeWitt High School Football Stadium
Location: DeWitt, Michigan
Project Details: New Sound Systen for the Football Stadium
- Fulcrum high output bi-amplified speaker to cover field and seating areas
- Fulcrum full range single amplified speaker to cover concession area
- Underground wiring from 24-space rack to speakers
- Low-profile 3-gang enclosure in press box
- Desktop controller to provide volume control for all sources
- New wired and wireless microphones, muting accessories and AV cables
Project Budget: $55,000
Project Completed: 2024
Durand High School Auditorium
Location: Durand, MI
Project Details: Sound, Video and Theatrical Lighting for the new auditorium
- 36-fader Allen & Heath digital mixing console
- 16×8 Dante Stage box
- New speakers, subwoofers and amplifiers
- Dedicated audio jacks and network
- Fixed 16×9 projection screen
- 12,000 lumen projector
- LED theatrical and moving lighting fixtures
- LED color-mixing fixtures
- Prodogy Hoist with QuickTouch Preset Controller and Control Accessories
- Complete rigging system
Project Budget: $505,000
Project Completed: 2024
Erie Insurance Perry Square Building Auditorium Renovation
Location: Erie, Pennyslvania
Project Details: Audio, Video and Lighting Systems Upgrades and LED Video Wall
Project Budget: $825,000
Project Completed: 2024
Friendship Village Kiva Auditorium
Location: Kalamazoo, Michigan
Project Details: Audio, Video and Lighting Systems Upgrade and Video Wall
- 16’ by 9’ ATS Pro video wall
- Shure wireless microphones
- Martin Audio O-line boxes
- Color-mixing LED fixtures
- Strand Controls for easy adjustment
Project Budget: $180,000
Project Completed: 2024
Holland High School Performing Arts Center
Location: Holland, Michigan
Project Details: Audio, Video and Theatrical Lighting upgrades
- Allen & Heath 24-fader digital mixing console
- Fulcrum speakers and subwoofers and Powersoft amplifiers for spectator seating
- Shure wireless microphones, transmitters and receivers
- Three QSC Touch Screen Controllers
- QSC PTZ Camera with Digital Projection 11,000 4K-HD, 10,500 lumen projector
- Digital Projection E-Vision 15,000 projector
- DaLite 16’x9’ Tension Advantage REC Electric Screen
- Pliant Wireless Intercom System
- ETC ColorSource Spot V
- New LED ellipsoidal, PAR, and cyclorama fixtures
- Seamless incorporation of theatrical and architectural lighting within the new control system
Project Budget: $392,000
Project Completed: 2024
Homewood Flossmoor Community HS CTE Addition and Renovation
Location: Flossmoor, Illinois
Project Details: AV Upgrades for the remodel and expansion of the North Building CTE’s Cullinary, Fashion Design and Interior Design classrooms
- Demonstration Stations with Marshal cameras, Senheiser wireless microphones, 49” LED Displays, and QSC 6.5” ceiling speakers
- Christie Captiva ultra-short throw projector with a projection-compatible whiteboard and 49” LED Displays
- Extron Touchpanels for easy system use
Project Budget: $180,000
Project Completed: 2024
Homewood Flossmoor Community HS Science Addition
Location: Flossmoor, Illinois
Project Details: AV systems for the new Net-Zero Science Building
- Airtame wireless presentation system
- QSC 6.5” Pendant speakers
- Christie Digital 5000 lumen short-throw, wall-mounted projectors
- HDMI/audio combo inputs
- Extron button control panel
- Epson 16,000 lumen ceiling mounted projector for the Learning Stairs
- Da-Lite Wireline Projection Screen 120” x 192”
- 2 Phillips 50” displays under the Learning Stairs
- Phillips 55” display with Nureva audio conferencing system
Project Budget: $600,000
Project Completed: 2024
Kankakee High School
Location: Kankakee, Illinois
Project Details: Audio and Video for the new Fieldhouse and Community Center additions
- Designed Audio Systems for multiple spaces
- Fieldhouse
- Auxiliary Gym and Weight Room
- Cheer Room
- Conference Room
- Lobby, Hallways and Concessions
- Bluetooth connections points in multiple spaces
- Projection System in Community Room
Project Budget: $190,000
Project Completed: 2024
University of Michigan Football Locker Rooms
Location: Ann Arbor, MI
Project Details: New Audio and Video Systems
- Low profile column style audio speakers installed in the ceiling between wooden slats
- Ceiling mounted subwoofers to support speakers
- Wall mounted touchpanels and HDMI inputs
- Wall mounted 86” TV’s for gaming and Signage
- 12’ x 7’ video wall in lounge
- Main sound system controls various audio zones
- AV closet to house all rack components
Budget: $14,000,000
Project Completed: 2024
2023 Select Completed Projects
Fennville High School Auditorium
Location: Fennville, MI
Project Details: Video and Theater Lighting for Auditorium.
Project Budget: $3,750
Project Completion: 2023
Ferris State University Center for Athletic Performance
Location: Big Rapids, MI
Project Details: New Sound and Video Systems for Athletic Facility
- AV Systems designed throughout CAP Facilities
- 8 loudspeakers to provide coverage for the entire seating area in Volleyball Arena
- Wall mounted displays throughout the facility
- Cameras automatically adjust to people’s location in Team Breakout Rooms for streaming
- Bluetooth connection points
Project Budget: $65,000
Project Completed: 2023
Garden Theater
Location: Frankfort, MI
Project Details: AV and Lighting System Design for Theater Renovation
- 529 seat, 100-year-old theater
- Cinema and Performance Speaker Systems
- Updated Audio System
- Wi-Fi Assisted Listening System (ADA compliant)
- New Digital Video Infrastructure
- Updated and Streamlined Video System
- Designed LED Lighting System for Stage
- New dead hung rigging system
- Replace all existing stage drapery and back of house masking drapery
Updated stage electrics, pipe grid and traveler tracks
Project Budget: $300,000
Project Completed: 2023
Grand Traverse Regional Land Conservancy
Location: Traverse City, MI
Project Details: AV Systems for the Conservation Center
- Speakers in each of 3 spaces divided into zones for optimal use
- A sound system designed for speech reinforcement for the meeting room
- Multiple cameras and microphones to allow for remote viewing of meetings and events
- Dedicated device to mix camera images and content with audio for archival and remote viewing.
- Touchpanel audio and video control
Project Budget: $150,000
Project Completed: 2023
Grand Valley State University
Location: Allendale, MI
Project Details: New AV Systems for Existing Gym and Weight Rooms
Project Budget: $105,000
Project Completed: 2023
Hudsonville High School
Location: Hudsonville, Michigan
Project Details: New Audio and Video Systems and Gymnasium center-hung Scoreboard
- QSC Speakers and Digital Mixing System components
- SoundTube pendant loudspeakers
- Shure wireless microphones
- Williams Sound Assistive Listening System
- Epson 30,000 lumen projector
- Da-Lite 414” diagonal screen
- Daktronics, Inc Center hung LED Scoreboard – 7’ high x 14.58’ wide x 14.58’ deep
- 2 fixed digital scoreboards
- Scoreboard Hoist
- All Sport Pro – Scoring Control Software
- Live Scorebug – Streaming Overlay Output
- Fixed digital locker clocks
- 4 focusable LED light fixtures within the scoreboard
Project Completed: 2023
Neland Avenue Christian Reformed Church
Location: Grand Rapids, MI
Project Details: Audio and Video Renovation for Lobby Addition
- Panasonic 7000 lumen projector
- Da-Lite 65” x 116” motorized ceiling screen
- Three Panasonic 65” full HD LCD displays
- 11 QSC ceiling speakers
- Shure wireless microphones
- Two 8” touchpanels for simple control of the system
- Assistive Listening System
Project Budget: $92,000
Project Completed: 2023
Pioneer High School Auditoriums
Location: Ann Arbor, MI
Project Details: Audio, Video and Lighting re-design for Two Auditoriums
- 1400 seat Schreiber Auditorium
- 300 seat Little Theater
- New Audio, Video and Lighting Systems in both spaces
- LED color mixing fixtures
- New Lighting controls and infrastructure
- Left/Right LED Video Walls in Schreiber
- New high performance sound system
Project Budget: $1,000,000
Project Completed: 2023
Union High School Auditorium
Location: Grand Rapids, MI
Project Details: Lighting System Upgrade for Existing Auditorium
Project Budget: $150,000
Project Completed: 2023
2022 Select Completed Projects
Grand Ledge Fine Arts Center
Location: Grand Ledge, MI
Project Details: New Audio, Video and Stage Lighting for the Fine Arts Center
- Wifi based assisted listening system
- Lighting control system for fixed and moving fixtures
- New LED color mixing fixtures
- New recording and streaming device
- New high quality audio system
- 12,000 lumen projector and 275” diagonal screen
Project Budget: $500,000
Project Completed: 2022
West Ottawa High School Football Field
Location: Holland, MI
Project Details: New Sound System and Video Scoreboard for the Football Field
- Two low-profile, 3-gang enclosures installed in the press box in each field
Football Field
- Daktronics 18’ x 32’ virtual video scoreboard with 16mm pixel resolution and 8,000 nits
- 160 degree viewing angle
- All Sports Pro Software
- Tablet Control
- Daktronics All Sport 5000 Series Control Console
- Live Video input
- End-Zone mounted large format loudspeaker system with fill speakers over bleacher seating
Soccer Field
- Two pairs of medium format loudspeakers
Project Budget: $400,000
Project Completed: 2022
2021 Select Completed Projects
Boyne City High School Auditorium
Location: Boyne City, MI
Project Details: New Sound, Video and Lighting Systems for the Auditorium
- New LED Color-Mixing Lighting System
- Fulcrum Acoustics Speaker Array Models and Subwoofers
- Flexible video system
- On stage and in the booth touchscreens
- New projection, camera and screen
- 620 seat Performing Arts Center
Project Budget: $525,000
Project Completed: 2021
Byron Center High School Fine Arts Center
Location: Byron Center, MI
Project Details: Audio, Video and Lighting System Upgrades for the Fine Arts Center
- New speaker system including 2 L’Acoustics A15 speaker arrays to cover the seating area
- 64-channel Allen & Heath digital mixing console
- New 30’ x 17’ fixed front projection video screen
- PTZ camera with AV-over-IP system linked to monitors in and around the space
- ETC Paradigm control system for lighting control
- ETC ION xe console for theatrical lighting control
- 50 new color-mixed fixtures and 20 LED retrofit modules
Project Budget: $500,000
Project Completed: 2021
Deaconess Aquatic Center
Location: Evansville, Indiana
Project Details: Competetive and Leisure Pool Sound Systems
- New sound system for both pools
- Fulcrum speakers and subwoofers throughout the competition pool for full coverage
- JBL speakers throughout the leisure pool
- Lab Gruppen 4 Channel Amplifiers in each space
- Ceiling speakers in public spaces
- Sound System control in each space with the ability to route audio from the Competition Pool elsewhere
- Shure wireless and headset microphones
- Touchpanels for simple control of the systems
Project Budget: $109,500
Project Completed: 2021
Laingsburg High School Auditorium
Location: Laingsburg, MI
Project Details: Audio, Video and Lighting for new Auditorium and Band Room Audio and Video
- 36-fader Allen & Heath digital mixing console
- 2 Fulcrum left/right speaker arrays to cover seating area
- Fulcrum 21” subwoofer and LabGruppen 4 channel amplifiers
- Fixed front 16’ by 9’ projected Video Screen
- 12,000 lumen projector
- Pan/Tilt/Zoom camera with Live Stream
- LED color mixing fixtures & moving light fixtures
- Digital Scenery video wall
- Motorized, adjustable acoustics
- New orchestra shell
- New rigging system including 32 line sets, stage drapery and tracks
- Low-level blue lights installed on pathways
- Band Room AV system
Project Budget: $505,000
Project Completion: 2021
Rockford High School Football
Location: Rockford, MI
Project Details: New Sound System and Scoreboard for Stadium Renovation.
- Danley large format loudspeakers, amplifiers and subwoofers
- Shure wireless microphones and headsets
- Daktronics LED Scoreboard Display 18’ x 32.4’
- Daktronics All Sport 5000 Series Control Console
- All Sports Pro – Scoring Control Software
Project Budget: $260,000
Project Completed: 2021
Trinity Lutheran Church
Location: Grand Rapids, MI
Project Details: New Sound and Camera Systems for existing Sanctuary
- Four pan/tilt/zoom sanctuary cameras
- Three pan/tilt/zoom contemporary space cameras
- NDI video switching and streaming
- New sanctuary main, delay, and choir speakers
- Multiple digital mixing system control points
- Wi-Fi based Bluetooth hearing assist system
- New wireless microphones and chancel inputs
- Video controls for organist monitor
Project Budget: $105,000
Project Completed: 2021
2020 Select Completed Projects
Brownwood Hotel
Location: Wildwood, Florida
Project Details: Comprehensive Audio and Video for a new hotel
- Ballroom AV System with four divisible rooms
- Six projectors and screens for flexibility
- Boardroom and Meeting Room AV Systems
- Background music system throughout hotel
- Pool and outdoor gardens speakers
- Complete Networked AV over IP system
- Outdoor patio AV systems
- Twenty individual spa rooms with dedicated AV
Two bars and restaurant with full AV
Project Budget: $750,000
Project Completed: 2020
First Presbyterian Church of Flint
Location: Flint, MI
Project Details: New Sound and Video for Education Wing
- 16’ x 9’ projection screen and projector
- Floor boxes for portable carts with large displays being used in flexible classroom spaces
- 14 pendant mounted speakers, 2 wireless microphones, and 4 microphone inputs
- Assistive Listening System using T-coil
- Two 65” monitor displays in the lobby area
- One 65” wall-mounted display in the lounge
Project Budget: $80,000
Project Completed: 2020
Northwestern Michigan College Innovation Center
Location: Traverse City, MI
Project Details: AV Systems for the Innovation Center
- Seven classroom spaces with flexible AV technology
- Three displays in each classroom
- Twenty student “huddle” rooms with AV in each
- Digital Signage for wayfinding and announcements
- Two seminar rooms for class collaboration
Project Budget: $300,000
Project Completed: 2020
+
Radiant Life Church
Location: Sturgis, Michigan
Project Details: AV System Design for the Lobby Addition and Renovation
- 6 Panasonic Displays: 3- 65” and 3- 55”
- 2 Panasonic 8500 lumen 1920×1200 16:10 Projectors
- 2 Screen Innovations 150” Diagonal ALR Fixed Projection Screens
- QSC Ceiling and Pendant speakers
- 2 JBL loudspeakers
- 2 Crestron Touchpanels for lobby video system control
- Network control from worship center computer
Project Budget: $88,750
Project Completed: 2020
2019 Select Completed Projects
Caledonia High School Football
Location: Caledonia, MI
Project Details: New Sound System for Stadium Renovation.
Project Budget: $65,000
Project Completed: 2019
Forest Hill Public Schools Fine Arts Center
Location: Grand Rapids, Michigan
Project Details: Fine Arts Center Video, Camera and Lighting
- Transition to LED color-mixing lighting
- New house lighting processor
- Infrastructure upgrades
- Update Lobby lighting to LED and daylight harvesting photocells
- Replace internal processing and re-condition dimming racks
- Identify transition to full LED lighting
- Replace 1 and add 3 Arbor Assist Motor Units
- New integrated control location to control all motor units
- New headblocks, arbors and interface cabling
Project Budget: $250,000
Project Completed: 2019
Hononegah Community High School Fieldhouse
Location: Rockton, Illinois
Project Details: Audio and Video throughout the new fieldhouse
Project Budget: $215,000
Project Completed: 2019
Lakeshore High School Football Field
Location: Stevensville, MI
Project Details: New Sound System for existing Football Field.
Project Budget: $75,000
Project Completed: 2019
Lemont High School Gymnasium
Location: Lemont, IL
Project Details: New Sound System for existing Gymnasium.
Project Budget: $85,000
Project Completed: 2019
TruVista Wealth Advisors
Project Name: Pine View Office Sound Masking System
Location: Farmington Hills, MI
Project Details: Sound Masking System for Office Space.