HAV Design Projects Currently Under Construction

Allegan High School Performing Arts Center

Location: Allegan, Michigan

Project Details: Updating the Audio, Video, and Stage Lighting Design that was originally built in 2003

AV Budget: $768,000

Chenery Auditorium

School District: Kalamazoo Public Schools

Location: Kalamazoo, Michigan

Project Details: Lighting upgrades to LED in the auditorium, ticketing areas, lobby, green room, dressing areas, meeting rooms and storage areas.

 AV Budget: $650,000

Comstock Park High School Auditorium

Location: Grand Rapids, Michigan

Project Details: The gymnasium is being updated with new audio, video and theatrical lighting systems.  Stage track and drapery will also updated.

 AV Budget: $155,000

East Grand Rapids High School

Performing Arts Center and Black Box 

Location: East Grand Rapids, Michigan

Project Details: Audio, Video and Lighting upgrades in both spaces as well as Drapery Design in the black box

 AV Budget: $1,500,000

East Jackson Community Schools

Auditorium Updating

Location: East Jackson, Michigan

Project Details: Audio, Video and Stage Lighting updating and upgrades

 AV Budget: $450,000

Eaton Rapids High School Auditorium

Location: Portage, Michigan

Project Details: Stage Lighting updating and upgrades

 AV Budget: $300,000

Farmington Central High School

Location: Farmington Central CUSD 265, Farmington, Illinois

Project Details: Audio and video design for the cafeteria and board room

 AV Budget: $100,700

Greenbriar Elementary

School District: Northbrook School District 28

Location: Northbrook, Illinois

Project Details: Audio, Video, and Stage Lighting Systems design for Cafetorium

Project Budget: $190,000

Harvest Orthodox Presbyterian Church

Location: Wyoming, Michigan

Project Details: Audio and Video Systems for the church’s addition

AV Budget: $120,000

Hemlock High School

Location: Hemlock, Michigan

Project Details: Theater planning, Audio, Video, Lighting, Rigging and Acoustics Design for existing high school theater and gymnasium

AV Budget: $515,000

Holland High School Football Stadium

Location: Holland, Michigan

Project Details: Audio System and Video Scoreboard Design for the new football stadium

AV Budget: $110,000

Howell Highlander Way Middle School

Location: Howell, Michigan

Project Details: Audio, video and stage lighting for the Learning Commons and Cafeteria

AV Budget: $200,000

Howell High School Fieldhouse

Location: Howell, Michigan

Project Details: New Audio and Video Scoreboard for Fieldhouse and Multi Purpose Room

AV Budget: $330,000

Howell Northwest and Southwest Elementary Schools

Location: Howell, Michigan

Project Details: Small auditorium stage lighting systems for two new elementary schools

AV Budget: $90,000

Innovation Central High School Auditorium

Location: Grand Rapids, Michigan

Project Details: Auditorium Audio, Video, Theatrical and Architectural Lighting, Rigging, Acoustic Orchestra Shell and Stage Track and Drapery

AV Budget: $1,900,000

Jenison Upper Elementary

School District: Jenison Public Schools

Location: Jenison, Michigan

Project Details: Audio and Video design for the new Grade 5-6 building: Gymnasium, Cafeteria, Learning Commons, Music Suite, STEM, ART, Breakout, and Conference areas

AV Budget: $520,000

Meadowbrook New Elementary

Location: Northbrook, Illinois

School District: Northbrook School District 28

Project Details: Audio and Video design services for the new elementary school: Cafetorium, Music Rooms, Hub Spaces, Small and Large Conference Rooms, Media Center and Digital Signage

Project Budget: $600,000

Michigan State University Spartan Success Center

Location: East Lansing, Michigan

Project Details: Audio and Video Systems and IT/Network Systems for the newly renovated and expanded Spartan Success Center in the Hannah Administration Building.

Budget: $141,000

 

Mid Michigan College

Location: Mt. Pleaseant, Michigan

Project Details: Audio and Video Systems Design for new Event Center

Project Budget: $150,000

Oak Park & River Forest High School District 200

Location: Oak Park, Illinois

Project Details: Audio and videos system design for P.E. and Theater addition and renovation.

AV Budget: $255,000

Okemos Middle School Auditorium

Location: Okemos, Michigan

Project Details: Audio, Video, Theatrical Lighting and Rigging systems for the new auditorium

AV Budget: $685,000

Ottawa Hills High School Auditorium

Location: Grand Rapids, Michigan

Project Details: Audio, Video, Theatrical Lighting and Rigging systems as well as AVoIP Infrastructure and Display design upgrades for the auditorium

AV Budget: $1.4 million

Palatine Park District

Location: Palatine, Illinois

Project Details: Audio and Video design Services for the Boardroom

Project Budget: $56,000

ResLife Church

Location: Big Rapids, Michigan

Project Details: Audio, Video and Theatrical Lighting for the new Worship Center

AV Budget: $1,000,000

Westmoor Elementary

School District: Northbrook School District 28

Location: Northbrook, Illinois

Project Details: Audio, Video, and Stage Lighting Systems design for Cafetorium

Project Budget: $35,000

2026 Select Completed Projects

Berkley High School

Auditorium Upgrades and Black Box/Choir Room Addition

Location: Berkley, Michigan

Project Details: 

   Auditorium

  • New audio system with 48-channel digital mixing console
  • Laser projector and motorized screen
  • Confidence monitors and lobby displays
  • PTZ camera and wireless intercom
  • Three touch panels for system control
  • LED theatrical lighting with new dimming, relay, and control systems

   Choir / Black Box Classroom

  • Ceiling-mounted projector and screen
  • Distributed speaker system
  • Wireless microphones and intercom
  • Audio mixer in secure mobile workstation
  • Six audio zone connection points
  • LED theatrical lighting with portable dimming and integrated controls

AV Budget: $925,000

Completed: 2026

             

Central Michigan University Plachta Auditorium

Location: Mt. Pleasant, Michigan

Project Details: Stage Lighting for Plachta Auditorium

Built in 1928, Plachta Auditorium at Central Michigan University’s Warriner Hall is approaching its 100th anniversary. HAV Design provided theatrical and architectural lighting and rigging design to modernize aging systems, improve safety and maintenance access, and enhance the auditorium’s capabilities for performances, presentations, and university events.

  • New networked theatrical lighting controls and 12,000-channel console
  • Approximately 60 new LED theatrical fixtures
  • Integrated LED architectural and house lighting
  • New motorized front-of-house lighting truss

AV Budget: $500,000

DeWitt Auditorium - Phase 1

DeWitt Public Schools

Location: DeWitt, Michigan

Project Details: Auditorium Audio, Video and Lighting Upgrades

  • New sound system with left/right loudspeakers and subwoofers
  • Upgraded amplifiers, processing, and a 33-fader digital mixing console
  • Flexible audio network (Dante) enables connections across the stage, supports recording/streaming, and integrates with video systems
  • Hanging microphones and an expanded 14-channel wireless microphone system support performances, presentations, and assistive listening
  • User-friendly touchpanels allow both technicians and non-technical users to control audio, video, and basic system functions
  • Existing assistive listening system is retained to meet ADA requirements, with additional microphones and accessories included
  • New lighting system includes LED fixtures, updated controls, and preset functionality accessible via touchpanels

AV Budget: $400,000

Completed: 2026

DeWitt High School Football Stadium Press Box

Location: DeWitt, Michigan

Project Details: Designing the audio system for the new press box at the football stadium

 AV Budget: $35,500

Ferndale High School

Auditorium Stage Lighting Modernization

Location: Ferndale, Michigan

Project Details: Theatrical lighting updates to the Ferndale High School Auditorium

  • New networked 2,048-channel console with touch screen control for stage and architectural lighting.
  • New digital control stations and iPad interface for presets and simple show operation.
  • Updated dimming and networked control systems with new sACN/DMX distribution throughout the stage and house.
  • Approximately 50 new LED fixtures, including profiles, Fresnels, footlights, cyclights, and PARs.
  • Approximately 24 existing LED fixtures were upgraded with new color-mixing LED engines and integrated into the new system.
  • New LED moving light package and two LED follow spots for performances and special events.
  • Fire alarm and security systems will override lighting controls, with an emergency transfer switch recommended for emergency lighting.

 AV Budget: $340,000

First Presbyterian Church of Flint – the Pipe Youth Space

Location: Flint, Michigan

Project Details: Audio and Video design for the Pipe youth space

 AV Budget: $200,000

Completed: 2026

Holly High School

Auditorium Lighting Upgrades

  • New networked relay/dimming panels and digital controls.
  • New power strips/outlets at stage, catwalk, and house lighting positions.
  • Upgrade to a motorized lighting batten and handheld/E-Stop controls.
  • Install a new 2,048-channel console with touchscreen and iPad control for presets and simple show operation.
  • Replace DMX connections with sACN network I/O throughout the booth, stage, catwalk, and lighting positions.
  • New power distribution and aircraft cable protection on the Catwalk.
  • Approximately 60 new color-mixing LED fixtures and two follow spots.
  • Replace running and stage work lights with LED fixtures.
  • Add dimmable LED architectural lighting with integrated controls, emergency overrides, and a new emergency transfer switch.

Location: Holly, Michigan

Project Details: New stage light fixture and control infrastructure for existing auditorium space.

AV Budget: $460,000

Lakeview Middle School Auditorium

Location: Battle Creek, Michigan

Project Details: New sound, video and stage lighting systems for the middle school auditorium and ancillary spaces.

  • New loudspeaker system with front fills and subwoofers for high-quality speech and performance reinforcement.
  • 64-channel digital mixing console, new control booth, digital stage boxes, networked audio, and performer monitors. 24-channel wireless microphone system, new vocal/instrument microphones, intercom, and stage accessories.
  • Wi-Fi assisted listening system plus audio feeds to dressing rooms, music rooms, backstage areas, and lobby.
  • New 16′ × 9′ motorized screen and long-life laser projector, along with portable HDMI inputs.
  • PTZ camera, networked video distribution, remote displays, and event recording/streaming capabilities.
  • Touchpanel controls provide simple operation of audio, video, and lighting for non-technical users.
  • Approximately 60 new LED fixtures, including ellipsoidals, PARs, moving lights, and LED follow spots.
  • New lighting controls, relay panels, plug boxes, DMX distribution, architectural lighting integration, and wireless iPad focus control.

Project Budget: $380,000

McComas Hall

School: Mississippi State University

Location: Mississippi State, Mississippi

Project Details: Theatrical Lighting and Rigging Updates

Project Budget: $300,000

Meadowbrook Elementary New Gymnasium

Northbrook School District 28

Location: Northbrook, Illinois

Project Details:

  • Six point-source loudspeakers provide even coverage for the court and bleachers
  • Audio equipment rack with amplification and processing located in a nearby storage room
  • Wall-mounted controller with Bluetooth connectivity for simple system operation
  • QR code provides mobile access to web-based system controls
  • Two microphone input locations for flexible event use
  • Two wireless microphones (handheld and headset) included
  • Wi-Fi assistive listening system with dedicated receivers and mobile device compatibility
  • Networked AV system enables centralized audio

Project Budget: $45,000

Completed: 2026

Minooka Central Community High School CTE

Career & Technical Education Building

Location: Minooka, Illinois

Project Details: Audio and Video Systems for Central Campus Classrooms

   Commercial Kitchen 340

  • Three displays and three demonstration cameras.
  • Wireless presentation and touchpanel system control.
  • Occupancy-based automatic shutdown.

   Culinary Arts 330

  • Three displays and two demonstration cameras.
  • Wireless presentation and touchpanel system control.
  • Occupancy-based automatic shutdown.

   Culinary Classroom 350

  • One display and two demonstration cameras.
  • Wireless presentation and touchpanel system control.
  • Occupancy-based automatic shutdown.

   Welding Lab 383

  • Distributed suspended displays and two demonstration cameras.
  • Wireless presentation and touchpanel system control.
  • Occupancy-based automatic shutdown.

Project Budget: $150,000

Minooka Central Community High School FH

New Fieldhouse added to the South Campus

Location: Minooka, Illinois

Project Details: Audio and Video Systems and scoreboards for the new fieldhouse

   Fieldhouse Sound System

  • Overhead loudspeakers and subwoofers provide even coverage across courts and track areas.
  • Flexible control through mobile mixing, touchpanels, Bluetooth, and wireless microphones.
  • Wi-Fi-based assisted listening system supports accessibility throughout the fieldhouse.

    Gymnasium LED Video Scoreboard

  • Large-format 3.9mm LED videoboard with integrated scoring, branding, and networked video distribution.
  • Content management and scoring software supports graphics, real-time data, and basketball, volleyball, and wrestling.
  • Integrated with the fixed-digit scoreboard and Lynx track timing system.

Project Budget: $190,000

Southern Illinois University Tedrick Welcome Center

Location: Carbondale, Illinois

Project Details: Audio and Video Systems for the new welcome center building

AV Budget: $320,000

Completion Date: 2026

2025 Select Completed Projects

Chippewa Valley Schools

Chippewa Valley High School Auditorium

Location: Clinton Township, Michigan

Project Details:  Audio, Video and Lighting upgrades

  • New sound system using Innovox speakers and subwoofers
  • New Powersoft amplifiers
  • Assisted listening package by Listen
  • New LED lighting throughout using ETC products
  • Stage drapery and tracks replaces
  • Upgrades to the intercom system with wireless options
  • Blue globe running lights backstage
  • Dimming racks and controls, stage, house and control booth control stations and existing stage lighting fixtures were kept and worked into the new system

Project Budget: $100,000

Project Completed: 2025

Clare-Gladwin Regional Education Service District

John C. Magnus  Career Education Center

Location: Clare, Michigan

Project Details:  Audio, Video and Low Voltage Design –

  • Safe and secure entrances using CCTV and card reader access controls
  • Clocks and PA system throughout
  • Classroom mobil carts with 86″ displays and soundbars
  • Motorized screens with laser projectors and ceiling speakers in the Conference Center
  • Classroom Voice Lift
  • Wireless presentation receivers
  • Touchpanels for room control and configureation in the Conference Center and Conference Room

Project Budget: $600,000

Project Completed: 2025

Coit Creative Arts Academy

Grand Rapids Public Schools

Location: Grand Rapids, Michigan

Project Details: The gymnasium was updated with new audio, video and theatrical lighting systems as well as new stage track and drapery.

 AV Budget: $155,000

Completed: 2025

Dakota High School Auditorium

Chippewa Valley School District

Location: Clinton Township, Michigan

Project Details: Auditorium upgrades to the Audio, Video, and Wireless Intercom systems and Stage Drapery, Track and Theatrical Lighting

  • Innovox speakers and subwoofers
  • Powersoft amplifiers
  • Assisted listening system by Listen
  • Megalite LED Followspots
  • ETC LED lighting
  • Maxlite blue globe Jelly Jar LED lights
  • New stage drapery and tracks
  • Dimming racks and controls, stage, house and control booth control stations and existing stage lighting fixtures remain and are re-used.

AV Budget: $100,000

Delta College K-Wing

Location: University Center, Michigan

Project Details: Audio and Video System upgrades for standard classrooms and an active learning classroom

Standard and Active Learning Classrooms

  • Wall-mounted 16:10 motorized projection screen
  • Ceiling-mounted laser projector and speakers
  • Primary AV equipment house in teaching station/cart
  • Button panel controller on the classroom AV carts
  • Desktop touch panel for control in the Active Learning Classroom
  • Wireless screen casting to any display

Active Learning Classroom Collaboration Features

  • Five (5) student collaboration “pods” located around the room perimeter
  • 55” display in each pod
  • Content sharing via:
    • Wired HDMI at table pocket
    • Wireless (Miracast™, web browser, AirPlay™, Extron App)
  • Table-mounted touch screen for local pod control

AV Budget: $450,000

Grand Ledge High School

Location: Grand Ledge, Michigan

Project Details: Competition Gymnasium Scoreboard system as well as Audio and Video upgrades for multiple spaces: Competetive Gym, Old Gym, Media Center, Drama Room, and Cafeteria

  • New wall-mounted 17’ x 10’ LED scoreboard display
  • Fulcrum 15” 2-way loudspeakers and high-power amplifiers in the main Gym bleachers and courts
  • QSC 15” 2-way loudspeakers and amplifiers in the Aux Gym
  • QSC 2-way loudspeakers and amplifiers in other spaces
  • Shure wireless microphones and receivers
  • Epson 10,000 lumen laser projector and wide zoom lens
  • 108” x 192” motorized projection screen in the Aux Gym
  • Epson 6000 lumen projectors and 65” x 116” DaLite manual projection screen in Drama Room and Media Center
  • New racks throughout to contain all AV inputs and Accessories
  • Wall mounted Touchpanels for system control in all spaces

AV Budget: $297,000

Scoreboard Budget: $180,000

Hayes Intermediate School

Location: Grand Ledge, Michigan

Project Details: Audio and video systems for Band and Choir rooms, Gymnasion and Cafeteria

  •    Loudspeakers to cover the bleacher and court areas
  •    Two-way wall-mounted loudspeakers in Choir and Band rooms
  •    Bluetooth input and connection points
  •    Wall mounted and moveable displays
  •    Amplifiers and DSP for all audio
  •    Laser projectors in the gymnasium and cafeteria
  •    Touchpanel system controls
  •    Ceiling mount motorized projection screens in gymnasium and cafeteria

AV Budget: $175,000

Completion: 2025

Lyons Township High School South Campus

Location: Western Springs, Illinois

Project Details: Audio and Video Systems for new Commons, Learning Stairs and renovated Choir, Band and Orchestra Rooms

Cafeteria/Commons/Learning Stairs

  • DaLite 87” x 153.75” recessed electric screen
  • Epson 3LCD Projector and Middle-Throw Zoom Lens
  • 5 LG 86” Displays throughout commons
  • QSYS Speakers, both wall and ceiling mounted
  • QSYS 7” touchscreen to control overall commons
  • QSYS 5” touchscreens for local control of displays
  • Wall-mounted equipment rack

Music Rooms: Band, Choir, Orchestra

  • DaLite 65” x 116” recessed electric screen
  • Epson 3LCD Laser Projector
  • Mobile equipment rack
  • 7” touchscreen on mobile rack for control
  • 2 QSYS wall mounted 10” speakers

All areas contain 2 wireless microphones

Project Budget: $290,000

Architect: DLA Architects

Projected Project Completion: 2026

Awards: Learning By Design magazine 2026 Outstanding Project 

 

Michigan State University - University Advancement

Location: East Lansing, Michigan

Project Details: Audio and Video Systems and Digital Signage Displays for conference rooms, colloboration space and Hub areas

  • Sharp NC 65” LED LCD 4K Monitors in the collaboration spaces, small conference rooms, and digital signage
  • Jupiter Systems Pana 105” 21:9 Ultra Wide LCD Displays for medium and large conference spaces and Hubs
  • Crestron Video Conference System
  • Crestron Touchscreens and Occupancy Sensors
  • Crestron Flush-mounted 6” ceiling loudspeakers and amplifiers in large conference spaces and Hubs
  • Biamp AVB Beamtracking ceiling microphones in large conference spaces and Hubs

Project Budget: $280,000

Completed: 2025

Northwestern Michigan College Hagerty Center

Location: Traverse City. Michigan

Project Details: Audio and Video Systems for renovated classroom and common spaces

  • Touchpanel controls
  • 98” and 75” wall mounted displays
  • Two mobile high-definition LED video walls 10’ by 6 ‘ with portable video and audio inputs
  • New AV system with the ability to use as separate spaces or a single space
  • New ceiling speakers
  • Assistive Listening system and existing racks were utilized in the redesign
  • New DSP and amplifiers
  • Wireless handheld and over the ear microphones
  • Direct video connection availability

Project Budget: $267,000

Pennoyer Elementary School

Location: Norridge, Illinois

Project Details:  Audio and Video Systems for Learning Hubs, Multi Purpose Room, Music Room and Media Center

Phase 1:

Classroom Hubs and Multi Purpose Room

  • Wall mounted displays and equipment racks
  • Touchpanels for primary control
  • Ceiling mounted speakers and wireless microphones

Music Room

  • Wireless Apple TV connection to moveable TV on cart
  • 2 wall mounted speakers at the front of the room
  • Rack housed in cabinet that slides out/rotates
  • Touchpanel for primary control

Phase 2:

Media Center

  • Epson 6,200 Lumen laser projector suspended from the ceiling
  • DaLite 58” x 104” screen
  • 86” LG Series UHD Signage TV
  • QSYS 4.5” two-way ceiling speakers and amplifier
  • Shure wireless microphone system
  • 7” Touchpanel for simple control of the system

Phase 1 Project Budget: $100,000   Completed in 2024

Phase 2 Project Budget: $45,000  Completed in 2025

People's Church

Location: East Lansing, Michigan

Project Details: Sanctuary and Social Hall Audio, Video and Lighting Systems

AV Budget: $92,000

Plainwell High School Athletics

Location: Plainwell, Michigan

Project Details:  Audio and Video Systems for the new fieldhouse gymnasium and pool

  • Flexible loudspeakers for the Gym bleachers and playing surface for multiple uses
  • High Power Subwoofer over the Gym playing surface
  • Loudspeakers to cover the pool deck and the bleachers
  • Ceiling speakers in the hallway, hospitality room concessions and public restroom spaces
  • Amplifiers and AV network switches
  • Stationary and portable Equipment racks
  • Multiple microphone/mixer input locations
  • Bluetooth audio connections
  • Touchpanels for user friendly control
  • Wireless microphones

Project Budget: $170,000

Project Completed: 2025

Three Rivers High School Auditorium

Location: Three Rivers, Michigan

Project Details: Audio, Video and Acoustic Design for the Auditorium and Music Room

  • Auditorium redesign and upgrade for all systems
    • Auditorium Audio
    • Auditorium Video
    • Wireless Intercom System
    • Auditorium House Lighting
    • Theatrical Lighting
  • Music room redesign and upgrade
    • Ceiling mounted projector and screen
    • Moveable equipment rack
    • Audio re-enforcement
    • Wireless and ceiling-hung microphones

AV Budget: $600,000

Project Completed:  2025

 

Toyota Indiana YMCA of Gibson County

Location: Princeton, Indiana

Project Details: Audio and Video System Design for the Renovation and Expansion of a School into a YMCA Facility

  • RFC Loudspeakers and QSC Ceiling Speakers
  • Powersoft Flexible Amplifiers with DSP
  • Shure Wireless Microphones
  • Wolfvision Cynap Pure Mini wireless presentation devices
  • Extron Touchpanels

Marshall Overhead Video Camera

Project Budget: $110,000

Project Completed: 2025

 

University School of Milwaukee

Dining Room Updates

Location: Milwaukee, Wisconsin

Project Details: Audio and video system design for two dining rooms, including independently operating spaces that have the ability to combine into one cohesive AV system.

Lower School/Middle School Dining Room Upgrades

  • 3 independent AV systems able to operate jointly
  • QSC 8” two-way low-profile speakers and 8-ch amplifier

Preschool Dining Room

  • QSC 6.5” two-way low-profile speakers and 2-ch amplifier

All Spaces

  • Shure Digital wireless receivers and transmitters
  • Epson 7,500 Lumen laser projector in each space mounted on a Draper ceiling scissors lift
  • DaLite 16:10 69” x 110” motorized screen
  • Crestron 7” wall mount touchscreen with the ability to connect to the AV system via bluetooth

AVTLR Budget: $165,000

Project Completed:  2025

Waverly High School Auditorium

Location: Lansing, Michigan

Project Details:  New Audio, Video, Control and Theatrical Lighting Systems

  • Dalite motorized projection screen 146” x 260”
  • Panasonic 12,000 lumen Laser Projector
  • Fulcrum speakers and subwoofers
  • Allen & Heath 36-fader digital mixing system
  • 75 new LED color mixing fixtures
  • Touchpanel controls at entrances and in the booth
  • Wireless intercom system
  • Panasonic displays in the lobby (65”) and backstage (43”)

Project Budget: $465,000

Project Completed: 2025

           

Worth School District 127

Location: Worth, Illinois

Buildings: Worthwoods Elementary School and Worth Junior High School

Project Details: Audio and Video for the additions to and the remodeling of two media centers, a multimedia room and a music room

AV Budget: $140,000

Project Completed: 2025

2024 Select Completed Projects

Calumet Middle School

Location: Calumet Park, Illinois

Project Details:  AV Systems for New Gym and Multi-Purpose Rooms

  • Loudspeakers to cover bleacher and floor areas
  • Amplifiers and DSP for all audio inside Arena
  • 2-zone ceiling speakers in large MP room
  • Bluetooth input and connection points
  • Microphones (lapel, over-the-ear, wireless)
  • Wall mounted and moveable displays
  • Delegate style discussion system in large MP room
  • Motorized 16:9 ratio projection screen in Small MP room

Project Budget: $225,000

Project Completed: 2024

Calvin University Athletics

Location: Grand Rapids, Michigan

Project Details:  New Soccer Stadium and Athletics Audio, Video and Scoreboard

  • 855 covered seating Soccer Stadium
  • Sound System with 6 Large-Format Loudspeakers and 2 Subwoofers
  • 65” Displays in the Team Rooms
  • Audio with Bluetooth function in Team Rooms
  • 8 65” Displays on motorized mounts in Football locker room

Project Budget: $500,000

Project Completed: 2024

Coopersville High School

Location: Coopersville, Michigan

Project Details:  Football Stadium and Athletic Field Audio Systems and Scoreboard

  • New Audio System for the Football Stadium
  • Two large-format loudspeakers supported by several fill speakers
  • New 32’ x 18’ 16mm pixel resolution Scoreboard
  • New Audio System for the Multipurpose Field
  • Two pairs of medium-format loudspeakers
  • DSP, amplifiers and other audio equipment housed in an equipment rack at each field
  • Ability to turn on/off system using a switch on the rack

Project Budget: $140,000

Project Completed: 2024

DeWitt High School Football Stadium

Location: DeWitt, Michigan

Project Details:  New Sound Systen for the Football Stadium

  • Fulcrum high output bi-amplified speaker to cover field and seating areas
  • Fulcrum full range single amplified speaker to cover concession area
  • Underground wiring from 24-space rack to speakers
  • Low-profile 3-gang enclosure in press box
  • Desktop controller to provide volume control for all sources
  • New wired and wireless microphones, muting accessories and AV cables

Project Budget: $55,000

Project Completed: 2024

     

Durand High School Auditorium

Location: Durand, MI

Project Details:  Sound, Video and Theatrical Lighting for the new auditorium

  • 36-fader Allen & Heath digital mixing console
  • 16×8 Dante Stage box
  • New speakers, subwoofers and amplifiers
  • Dedicated audio jacks and network
  • Fixed 16×9 projection screen
  • 12,000 lumen projector
  • LED theatrical and moving lighting fixtures
  • LED color-mixing fixtures
  • Prodogy Hoist with QuickTouch Preset Controller and Control Accessories
  • Complete rigging system

Project Budget: $505,000

Project Completed: 2024

   

Erie Insurance Perry Square Building Auditorium Renovation

Location: Erie, Pennyslvania

Project Details:  Audio, Video and Lighting Systems Upgrades and LED Video Wall

Project Budget: $825,000

Project Completed: 2024

Friendship Village Kiva Auditorium

Location: Kalamazoo, Michigan

Project Details:  Audio, Video and Lighting Systems Upgrade and Video Wall

  • 16’ by 9’ ATS Pro video wall
  • Shure wireless microphones
  • Martin Audio O-line boxes
  • Color-mixing LED fixtures
  • Strand Controls for easy adjustment

Project Budget: $180,000

Project Completed: 2024

Holland High School Performing Arts Center

Location: Holland, Michigan

Project Details:  Audio, Video and Theatrical Lighting upgrades

  • Allen & Heath 24-fader digital mixing console
  • Fulcrum speakers and subwoofers and Powersoft amplifiers for spectator seating
  • Shure wireless microphones, transmitters and receivers
  • Three QSC Touch Screen Controllers
  • QSC PTZ Camera with Digital Projection 11,000 4K-HD, 10,500 lumen projector
  • Digital Projection E-Vision 15,000 projector
  • DaLite 16’x9’ Tension Advantage REC Electric Screen
  • Pliant Wireless Intercom System
  • ETC ColorSource Spot V
  • New LED ellipsoidal, PAR, and cyclorama fixtures
  • Seamless incorporation of theatrical and architectural lighting within the new control system

Project Budget: $392,000

Project Completed: 2024

 

Homewood Flossmoor Community HS CTE Addition and Renovation

Location: Flossmoor, Illinois

Project Details:  AV Upgrades for the remodel and expansion of the North Building CTE’s Cullinary, Fashion Design and Interior Design classrooms

  • Demonstration Stations with Marshal cameras, Senheiser wireless microphones, 49” LED Displays, and QSC 6.5” ceiling speakers
  • Christie Captiva ultra-short throw projector with a projection-compatible whiteboard and 49” LED Displays
  • Extron Touchpanels for easy system use

Project Budget: $180,000

Project Completed: 2024

             

Homewood Flossmoor Community HS Science Addition

Location: Flossmoor, Illinois

Project Details:  AV systems for the new Net-Zero Science Building

  • Airtame wireless presentation system
  • QSC 6.5” Pendant speakers
  • Christie Digital 5000 lumen short-throw, wall-mounted projectors
  • HDMI/audio combo inputs
  • Extron button control panel
  • Epson 16,000 lumen ceiling mounted projector for the Learning Stairs
  • Da-Lite Wireline Projection Screen 120” x 192”
  • 2 Phillips 50” displays under the Learning Stairs
  • Phillips 55” display with Nureva audio conferencing system

Project Budget: $600,000

Project Completed: 2024

Kankakee High School

Location: Kankakee, Illinois

Project Details:  Audio and Video for the new Fieldhouse and Community Center additions

  • Designed Audio Systems for multiple spaces
    • Fieldhouse
    • Auxiliary Gym and Weight Room
    • Cheer Room
    • Conference Room
    • Lobby, Hallways and Concessions
  • Bluetooth connections points in multiple spaces
  • Projection System in Community Room

Project Budget: $190,000

Project Completed: 2024

University of Michigan Football Locker Rooms

Location: Ann Arbor, MI

Project Details:  New Audio and Video Systems

  • Low profile column style audio speakers installed in the ceiling between wooden slats
  • Ceiling mounted subwoofers to support speakers
  • Wall mounted touchpanels and HDMI inputs
  • Wall mounted 86” TV’s for gaming and Signage
  • 12’ x 7’ video wall in lounge
  • Main sound system controls various audio zones
  • AV closet to house all rack components

Budget: $14,000,000

Project  Completed: 2024

2023 Select Completed Projects

Fennville High School Auditorium

Location:  Fennville, MI

Project Details:  Video and Theater Lighting for Auditorium.

Project Budget: $153,250

Project Completion: 2023

Ferris State University Center for Athletic Performance

Location: Big Rapids, MI

Project Details:  New Sound and Video Systems for Athletic Facility

  • AV Systems designed throughout CAP Facilities
  • 8 loudspeakers to provide coverage for the entire seating area in Volleyball Arena
  • Wall mounted displays throughout the facility
  • Cameras automatically adjust to people’s location in Team Breakout Rooms for streaming
  • Bluetooth connection points

Project Budget: $65,000

Project Completed: 2023

 

 

Garden Theater

Location: Frankfort, MI

Project Details:  AV and Lighting System Design for Theater Renovation

  • 529 seat, 100-year-old theater
  • Cinema and Performance Speaker Systems
  • Updated Audio System
  • Wi-Fi Assisted Listening System (ADA compliant)
  • New Digital Video Infrastructure
  • Updated and Streamlined Video System
  • Designed LED Lighting System for Stage
  • New dead hung rigging system
  • Replace all existing stage drapery and back of house masking drapery

Updated stage electrics, pipe grid and traveler tracks

Project Budget: $300,000

Project Completed: 2023

   

 

 

Grand Traverse Regional Land Conservancy

Location: Traverse City, MI

Project Details:  AV Systems for the Conservation Center

  • Speakers in each of 3 spaces divided into zones for optimal use
  • A sound system designed for speech reinforcement for the meeting room
  • Multiple cameras and microphones to allow for remote viewing of meetings and events
  • Dedicated device to mix camera images and content with audio for archival and remote viewing.
  • Touchpanel audio and video control

Project Budget: $150,000

Project Completed: 2023

     

Grand Valley State University

Location: Allendale, MI

Project Details:  New AV Systems for Existing Gym and Weight Rooms

Project Budget: $105,000

Project Completed: 2023

Hudsonville High School

Location: Hudsonville, Michigan

Project Details:  New Audio and Video Systems and Gymnasium center-hung Scoreboard

  • QSC Speakers and Digital Mixing System components
  • SoundTube pendant loudspeakers
  • Shure wireless microphones
  • Williams Sound Assistive Listening System
  • Epson 30,000 lumen projector
  • Da-Lite 414” diagonal screen
  • Daktronics, Inc Center hung LED Scoreboard – 7’ high x 14.58’ wide x 14.58’ deep
  • 2 fixed digital scoreboards
  • Scoreboard Hoist
  • All Sport Pro – Scoring Control Software
  • Live Scorebug – Streaming Overlay Output
  • Fixed digital locker clocks
  • 4 focusable LED light fixtures within the scoreboard

Project  Completed: 2023

                 

Neland Avenue Christian Reformed Church

Location:  Grand Rapids, MI

Project Details:  Audio and Video Renovation for Lobby Addition

  • Panasonic 7000 lumen projector
  • Da-Lite 65” x 116” motorized ceiling screen
  • Three Panasonic 65” full HD LCD displays
  • 11 QSC ceiling speakers
  • Shure wireless microphones
  • Two 8” touchpanels for simple control of the system
  • Assistive Listening System

Project Budget: $92,000

Project Completed: 2023

Pioneer High School Auditoriums

Location: Ann Arbor, MI

Project Details:  Audio, Video and Lighting re-design for Two Auditoriums

  • 1400 seat Schreiber Auditorium
  • 300 seat Little Theater
  • New Audio, Video and Lighting Systems in both spaces
  • LED color mixing fixtures
  • New Lighting controls and infrastructure
  • Left/Right LED Video Walls in Schreiber
  • New high performance sound system

Project Budget: $1,000,000

Project Completed: 2023

   

Union High School Auditorium

Location: Grand Rapids, MI

Project Details:  Lighting System Upgrade for Existing Auditorium

Project Budget: $150,000

Project Completed: 2023

2022 Select Completed Projects

Calvin University School of Business

Location: Grand Rapids, Michigan

Project Details: Our team designed the audio/visual systems throughout the facility, including classrooms, seminar spaces, and breakout rooms, helping create engaging environments for learning and collaboration. A standout feature of the project is the impressive two-story video wall in the lobby, complemented by stock ticker displays on both levels that provide dynamic information for students, faculty, and visitors.

Budget: $366,000

Project  Completed: 2022

Central Michigan University Bush Theater

Location: Mt. Pleasant, Michigan

Project Details:  New Audio, Video and Wireless Intercom

Budget: $380,000

Project  Completed: 2022

Grand Ledge Fine Arts Center

Location: Grand Ledge, MI

Project Details:  New Audio, Video and Stage Lighting for the Fine Arts Center

  • Wifi based assisted listening system
  • Lighting control system for fixed and moving fixtures
  • New LED color mixing fixtures
  • New recording and streaming device
  • New high quality audio system
  • 12,000 lumen projector and 275” diagonal screen

Project Budget: $500,000

Project Completed: 2022

   

Lincoln-Way East High School

Location: Frankfort, Illinois

Project Details:  New Audio and Video Systems for the Weight Room

Project Budget: $284,000

Project Completed: 2022

West Ottawa High School Football Field

Location: Holland, MI

Project Details:  New Sound System and Video Scoreboard for the Football Field

  • Two low-profile, 3-gang enclosures installed in the press box in each field

Football Field

  • Daktronics 18’ x 32’ virtual video scoreboard with 16mm pixel resolution and 8,000 nits
  • 160 degree viewing angle
  • All Sports Pro Software
  • Tablet Control
  • Daktronics All Sport 5000 Series Control Console
  • Live Video input
  • End-Zone mounted large format loudspeaker system with fill speakers over bleacher seating

Soccer Field

  • Two pairs of medium format loudspeakers

Project Budget: $400,000

Project Completed: 2022

2021 Select Completed Projects

Boyne City High School Auditorium

Location: Boyne City, MI

Project Details:  New Sound, Video and Lighting Systems for the Auditorium

  • New LED Color-Mixing Lighting System
  • Fulcrum Acoustics Speaker Array Models and Subwoofers
  • Flexible video system
  • On stage and in the booth touchscreens
  • New projection, camera and screen
  • 620 seat Performing Arts Center

Project Budget: $525,000

Project Completed: 2021

    

Byron Center High School Fine Arts Center

Location: Byron Center, MI

Project Details:  Audio, Video and Lighting System Upgrades for the Fine Arts Center

  • New speaker system including 2 L’Acoustics A15 speaker arrays to cover the seating area
  • 64-channel Allen & Heath digital mixing console
  • New 30’ x 17’ fixed front projection video screen
  • PTZ camera with AV-over-IP system linked to monitors in and around the space
  • ETC Paradigm control system for lighting control
  • ETC ION xe console for theatrical lighting control
  • 50 new color-mixed fixtures and 20 LED retrofit modules

Project Budget: $500,000

Project Completed: 2021

     

 

Deaconess Aquatic Center

Location: Evansville, Indiana

Project Details:  Competetive and Leisure Pool Sound Systems

  • New sound system for both pools
  • Fulcrum speakers and subwoofers throughout the competition pool for full coverage
  • JBL speakers throughout the leisure pool
  • Lab Gruppen 4 Channel Amplifiers in each space
  • Ceiling speakers in public spaces
  • Sound System control in each space with the ability to route audio from the Competition Pool elsewhere
  • Shure wireless and headset microphones
  • Touchpanels for simple control of the systems

Project Budget: $109,500

Project Completed: 2021

Laingsburg High School Auditorium

 Location:  Laingsburg, MI

Project Details:  Audio, Video and Lighting for new Auditorium and Band Room Audio and Video

  • 36-fader Allen & Heath digital mixing console
  • 2 Fulcrum left/right speaker arrays to cover seating area
  • Fulcrum 21” subwoofer and LabGruppen 4 channel amplifiers
  • Fixed front 16’ by 9’ projected Video Screen
  • 12,000 lumen projector
  • Pan/Tilt/Zoom camera with Live Stream
  • LED color mixing fixtures & moving light fixtures
  • Digital Scenery video wall
  • Motorized, adjustable acoustics
  • New orchestra shell
  • New rigging system including 32 line sets, stage drapery and tracks
  • Low-level blue lights installed on pathways
  • Band Room AV system

Project Budget: $505,000

Project Completion: 2021

     

 

 

Rockford High School Football

Location:  Rockford, MI

Project Details:  New Sound System and Scoreboard for Stadium Renovation.

  • Danley large format loudspeakers, amplifiers and subwoofers
  • Shure wireless microphones and headsets
  • Daktronics LED Scoreboard Display 18’ x 32.4’
  • Daktronics All Sport 5000 Series Control Console
  • All Sports Pro – Scoring Control Software

Project Budget: $260,000

Project Completed: 2021

 

Poppy's Social

Location: Glencoe, Illinois

Project Details:  Audio and Video for New Dining Venue

  • QSC Ceiling, Pendent Ceiling, and surface mount Speakers
  • Two wall mount Touchpanels
  • Six zones that can be used individual or in any grouping
  • Shure wireless microphone programable to various zones
  • NEC 50” and 65” Full HD LCD Displays
  • Two NEC 4-Display Video Walls
  • 8” touchscreens at each bar location to operate system components

Project Budget: $134,000

Project Completed: 2021

Trinity Lutheran Church

Location: Grand Rapids, MI

Project Details:  New Sound and Camera Systems for existing Sanctuary

  • Four pan/tilt/zoom sanctuary cameras
  • Three pan/tilt/zoom contemporary space cameras
  • NDI video switching and streaming
  • New sanctuary main, delay, and choir speakers
  • Multiple digital mixing system control points
  • Wi-Fi based Bluetooth hearing assist system
  • New wireless microphones and chancel inputs
  • Video controls for organist monitor

Project Budget: $105,000

Project Completed: 2021

2020 Select Completed Projects

Brownwood Hotel

Location:  Wildwood, Florida

Project Details:  Comprehensive Audio and Video for a new hotel

  • Ballroom AV System with four divisible rooms
  • Six projectors and screens for flexibility
  • Boardroom and Meeting Room AV Systems
  • Background music system throughout hotel
  • Pool and outdoor gardens speakers
  • Complete Networked AV over IP system
  • Outdoor patio AV systems
  • Twenty individual spa rooms with dedicated AV

Two bars and restaurant with full AV

Project Budget: $750,000

Project Completed: 2020

First Presbyterian Church of Flint

Location: Flint, MI

Project Details:  New Sound and Video for Education Wing

  • 16’ x 9’ projection screen and projector
  • Floor boxes for portable carts with large displays being used in flexible classroom spaces
  • 14 pendant mounted speakers, 2 wireless microphones, and 4 microphone inputs
  • Assistive Listening System using T-coil
  • Two 65” monitor displays in the lobby area
  • One 65” wall-mounted display in the lounge

Project Budget: $80,000

Project Completed: 2020

   

Northwestern Michigan College Innovation Center

 Location: Traverse City, MI

Project Details:  AV Systems for the Innovation Center

  • Seven classroom spaces with flexible AV technology
  • Three displays in each classroom
  • Twenty student “huddle” rooms with AV in each
  • Digital Signage for wayfinding and announcements
  • Two seminar rooms for class collaboration

Project Budget: $300,000

Project Completed: 2020

                                                       +  

Radiant Life Church

Location:  Sturgis, Michigan

Project Details:  AV System Design for the Lobby Addition and Renovation

  • 6 Panasonic Displays: 3- 65” and 3- 55”
  • 2 Panasonic 8500 lumen 1920×1200 16:10 Projectors
  • 2 Screen Innovations 150” Diagonal ALR Fixed Projection Screens
  • QSC Ceiling and Pendant speakers
  • 2 JBL loudspeakers
  • 2 Crestron Touchpanels for lobby video system control
  • Network control from worship center computer

Project Budget: $88,750

Project Completed: 2020

2019 Select Completed Projects

Caledonia High School Football

Location:  Caledonia, MI

Project Details:  New Sound System for Stadium Renovation.

Project Budget: $65,000

Project Completed: 2019

 

Forest Hill Public Schools Fine Arts Center

Location:  Grand Rapids, Michigan

Project Details: Fine Arts Center Video, Camera and Lighting

  • Transition to LED color-mixing lighting
  • New house lighting processor
  • Infrastructure upgrades
  • Update Lobby lighting to LED and daylight harvesting photocells
  • Replace internal processing and re-condition dimming racks
  • Identify transition to full LED lighting
  • Replace 1 and add 3 Arbor Assist Motor Units
  • New integrated control location to control all motor units
  • New headblocks, arbors and interface cabling

Project Budget: $250,000

Project Completed: 2019

Hononegah Community High School Fieldhouse

Location:  Rockton, Illinois

Project Details:  Audio and Video throughout the new fieldhouse

Project Budget: $215,000

Project Completed: 2019

Lakeshore High School Football Field

Location: Stevensville, MI

Project Details:  New Sound System for existing Football Field.

Project Budget: $75,000

Project Completed: 2019

 

Lemont High School Gymnasium

Location:  Lemont, IL

Project Details:  New Sound System for existing Gymnasium.

Project Budget: $85,000

Project Completed: 2019

   

         

TruVista Wealth Advisors

Project Name: Pine View Office Sound Masking System

Location:  Farmington Hills, MI

Project Details:  Sound Masking System for Office Space.

Technology that Simply Works