HAMILTON AV DESIGN PROJECTS
Case Study: Sports AV Design for Hononegah HS Fieldhouse
Hononegah High School was determined to provide their athletes a proper place to train and compete. Read how Hamilton AV Design supported Hononegah High School’s efforts by designing a versatile and capable audio system.
Case Study: Rocking Out in the Homewood-Flossmoor Swimming Lanes
The time came for Homewood-Flossmoor’s pool to update the old, struggling sound system. Read how Hamilton AV Design ensured the high quality upgrades would last for years to come.
Case Study: From Makeshift to Modern
Trinity Lutheran Church made do with an existing gym space and a piecemeal audio system. Read how Hamilton AV Design made what was makeshift into a modern system.
Calvin College Chapel
Calvin College’s new Chapel sound system was not functioning at its full potential. While Calvin’s current year budget did not have room for an entirely new system, it did allow for some work to optimize the current system. Longtime tech director Carl Hordyk turned...
Bath Public Schools
The Bath Public Schools Middle School auditorium was originally constructed in the 1980s. As with many such spaces, the technology had not had any significant updates since the original construction. With the latest bond issue, the district recognized that the space...
Berlin Fair
Sound systems for places like fairgrounds aren’t complicated. So why do so many of them sound so bad? That was a problem Berlin Fair personnel had to solve when it came to their own system. The Marne, Michigan-based fairgrounds had a dated sound system for their...
WEST MICHIGAN BASED
55 East Main Avenue
Zeeland, MI 49464
Recent Comments