HAMILTON AV DESIGN PROJECTS
Case Study: From Makeshift to Modern
Trinity Lutheran Church made do with an existing gym space and a piecemeal audio system. Read how Hamilton AV Design made what was makeshift into a modern system.
Calvin College Chapel
Calvin College’s new Chapel sound system was not functioning at its full potential. While Calvin’s current year budget did not have room for an entirely new system, it did allow for some work to optimize the current system. Longtime tech director Carl Hordyk turned...
Bath Public Schools
The Bath Public Schools Middle School auditorium was originally constructed in the 1980s. As with many such spaces, the technology had not had any significant updates since the original construction. With the latest bond issue, the district recognized that the space...
Berlin Fair
Sound systems for places like fairgrounds aren’t complicated. So why do so many of them sound so bad? That was a problem Berlin Fair personnel had to solve when it came to their own system. The Marne, Michigan-based fairgrounds had a dated sound system for their...
Redeemer Church Ann Arbor
Taking over the headquarters building of an historic fraternity isn’t the usual trajectory path for churches moving to a new building. But for Redeemer Church of Ann Arbor that was the opportunity that presented itself. Space near the campus of the University of...
Grace Protestant Reformed Church Expansion
Grace Protestant Reformed Church recently undertook an expansion project to increase the size of their worship space. The new space seats approximately 400 people — a significant increase in seating from the old space. KVO Communications was selected by the church to...
WEST MICHIGAN BASED
55 East Main Avenue
Zeeland, MI 49464
Recent Comments